Planning Tower Production Around an EPC Schedule
An EPC contractor may have a fixed tower erection date, but that does not mean the tower manufacturer has a complete production-ready package. Drawings may still be under review, steel…
Read More →Project quotations, supplier selection, production planning, export packing and delivery coordination.
An EPC contractor may have a fixed tower erection date, but that does not mean the tower manufacturer has a complete production-ready package. Drawings may still be under review, steel…
Read More →A transmission tower shipment may contain thousands of individual steel members, connection plates, bolts, and accessories. Even a small manufacturing error can create significant problems when these components reach an…
Read More →A missing brace, connection plate, bolt package, or tower member may represent only a small fraction of an overseas steel structure shipment. At the erection site, however, that single missing…
Read More →A transmission tower may contain hundreds or thousands of individual angles, plates, bracing members, bolts, and connection components. Once those parts have been galvanized, many look similar. The challenge for…
Read More →Choosing a transmission tower manufacturer is not simply a matter of comparing price per ton. For a utility or EPC contractor, the supplier must convert approved drawings and project specifications…
Read More →A transmission tower RFQ can contain dozens of documents, but the basic quotation problem is simple: the supplier needs enough information to determine what structures are required, what loads they…