Steel Fabrication & Hot-Dip Galvanizing

Steel components fabricated to your drawings in China, hot-dip galvanized, inspected and prepared for export. Review manufacturing, coating and packing requirements with one coordinated project scope.

Illustration of a hot-dip galvanizing process for steel components

From Your Drawing to Finished Steelwork

A practical starting point for equipment makers, installation contractors and engineering project teams. Suitability is reviewed against the actual component and delivery requirements.

  • Equipment & Pipe Supports

  • Substation Steelwork

  • Platforms, Stairs & Railings

  • Custom Frames & Connections

One Coordinated Delivery Process

  1. Drawing Review

    Confirm dimensions, material, fabrication scope and project documents.

  2. Fabrication

    Coordinate cutting, drilling, welding and assembly requirements.

  3. Hot-Dip Galvanizing

    Review component suitability and the specified coating requirements.

  4. Inspection

    Check the agreed dimensions, finish and inspection documentation.

  5. Export Packing

    Agree component identification, packing lists and the loading plan.

Check the Fit Before Production

Component size, weight, shape and handling requirements affect fabrication, galvanizing and shipping. Please share drawings so the proposed route can be checked.

  • Component dimensions, weight and handling points
  • Coating specification and inspection acceptance
  • Assembly relationships, marking and container space
  • Destination requirements, lead time and landed cost
Illustration of finished galvanized steel supports and components

Discuss Your Steelwork Project

Share drawings, quantities or tonnage, coating requirements, destination and your target delivery date.

Request a Project Quote
WhatsApp+852 6154 1095