
Communication Towers
Lattice towers and monopoles for telecom, microwave, broadcast and wireless infrastructure, reviewed against the intended equipment and site requirements.

Category 03
Communication Towers
Lattice steel towers and monopoles for cellular networks (4G/5G), microwave relay, radio broadcasting, and wireless infrastructure. Designed to support multiple antenna arrays, microwave dishes, and equipment platforms with full wind and ice load analysis.
| Parameter | Specification |
|---|---|
| Tower Types | Self-supporting lattice, guyed mast, monopole |
| Height Range | 15 m – 100 m (custom heights available) |
| Configuration | 3-leg / 4-leg triangular or square lattice |
| Antenna Capacity | Multi-operator (3–6 sectors), co-location ready |
| Material | Q355B / Q420B angle steel or tubular sections |
| Corrosion Protection | Hot-dip galvanized per ISO 1461 or ASTM A123 |
| Design Standards | TIA-222, ANSI/TIA-322, IEC 60652, or local codes |
| Wind Load | Per site-specific wind zone (up to 200 km/h) |
- Full structural analysis & foundation design
- Integrated ladder, platform, cable tray, and lighting
- Modular bolt-together sections for easy transport
- Compliant with telecom operator specifications
Project Information for a Quotation
Share the applicable drawings and requirements so the manufacturing and supply scope can be reviewed. Final specifications should follow the approved project documents.
- Application, required tower height, layout and intended tower configuration.
- Antenna, dish, platform, cable and other equipment data for the applicable structural review.
- Site conditions, applicable wind and ice loading basis, and project design requirements.
- Required access components, coating, inspection records, quantities and delivery scope.