Angle steel and tubular transmission towers for overhead power line projects, with project-specific manufacturing and inspection requirements.

Power transmission tower steel structure
Category 01

Power Transmission Towers

Voltage range: 35 kV to 750 kV. Hengshengda manufactures angle steel and tubular transmission towers for overhead power lines worldwide. Our towers are designed to comply with IEEE, CSA, BS, AS/NZS, and ASCE standards and fabricated from high-strength structural steel with hot-dip galvanized coating per ISO 1461.

Tower Height Reference

Transmission Tower Height Range by Voltage Grade

Straight-Line Tower

Mainly used in areas where the transmission line runs straight.

35kV
12-36 m
110kV
15-51 m
220kV
18-54 m
500kV
24-60 m
750kV
24-102 m

Angle Tower

Mainly used at line turning points and terminal sections.

35kV
9-24 m
110kV
15-27 m
220kV
18-30 m
500kV
21-33 m
750kV
24-36 m

Crossing Tower

Mainly used where lines cross roads, railways, rivers, valleys, power lines, and communication lines.

35kV
27-48 m
110kV
27-48 m
220kV
30-54 m
500kV
36-60 m
750kV
36-102 m

  • Custom design per project specification
  • Full-scale tower testing available
  • CAD / PLS-Tower / SAW detailed drawings
  • Strict QC: material traceability & weld inspection

→ Contact Sales

Project Information for a Quotation

Share the applicable drawings and requirements so the manufacturing and supply scope can be reviewed. Final specifications should follow the approved project documents.

  • Project location, nominal voltage, circuit arrangement and the applicable design basis.
  • Approved tower drawings or the required configuration, loading data and material list.
  • Applicable material, coating, inspection and document requirements.
  • Required quantities, supply boundaries, delivery destination and project schedule.