Contact HSD Steel

Tell Us About Your Project

Contact our team for towers and steel structures, bolts and fasteners, or drawing-based steel fabrication with hot-dip galvanizing and export delivery.

Typical response within 24 hours For faster quotation, include drawings, quantity, destination port, standards, and expected delivery schedule.

Project Inquiry

Send the basic project information once. Our sales and engineering team can respond with a practical quotation path.

Quotation details (optional)

Share the details you know; final specifications will be reviewed against your project documents.

Your information and files will be used to review and respond to this inquiry.

RFQ Checklist

What Helps Us Quote Accurately

Clear drawings and shipping details reduce back-and-forth and help us prepare a practical export proposal.

1

Drawings

General arrangement, member drawings, BOM, or foundation details.

2

Standards

Design code, galvanizing requirement, steel grade, and inspection level.

3

Quantity

Total tonnage, tower count, pole length, hardware list, or shipment batch.

4

Destination

Destination port, delivery terms, schedule, and third-party audit needs.

Need a Factory Visit or Audit?

We can coordinate technical discussion, documentation review, and factory inspection scheduling.

Email HSD Steel
WhatsApp+852 6154 1095