Finished galvanized steel tubular poles in HSD steel structure fabrication workshop
Home / Products / Steel Monopoles and Tubular Poles

Steel Monopoles and Tubular Poles

Tapered steel monopoles and tubular poles for power, telecom, lighting and infrastructure applications, specified for the requirements of each project.

Steel tubular monopole
Category 04

Steel Monopoles

Multi-sided tapered steel monopoles for power distribution (12 kV – 230 kV), telecommunication towers, street lighting, and traffic signal poles. Manufactured from high-strength steel plate with continuous longitudinal welding.

ParameterSpecification
Voltage Class12 kV – 230 kV
Cross-Section12-sided / 16-sided / 20-sided / round tapered
Height Range9 m – 50 m (single piece or modular)
Base DiameterUp to 1,500 mm
Wall Thickness4 mm – 25 mm
MaterialQ355B / Q420B / Q460C / ASTM A572
Corrosion ProtectionHot-dip galvanized or thermal spray + paint
  • Suitable for power, telecom, and lighting
  • Arm brackets & base plates included
  • Low maintenance & long service life
  • Transport-friendly section design

→ Contact Sales

Project Information for a Quotation

Share the applicable drawings and requirements so the manufacturing and supply scope can be reviewed. Final specifications should follow the approved project documents.

  • Application, required height, arrangement and the applicable project loading data.
  • Approved section, connection, base plate and anchor bolt drawings where available.
  • Material, coating, welding and inspection requirements defined for the project.
  • Required quantities, transport length constraints, delivery destination and supply boundaries.

Discuss Your Project Requirements

Send your specifications, drawings or RFQ to discuss the required manufacturing, inspection and delivery scope.

Request a Project Quote

View All Products

WhatsApp+852 6154 1095