
Precision Forming
Steel plates and sections are formed to project drawings for tubular poles, gantries, and custom structures.

ISO-certified steel structure manufacturer serving transmission, substation, telecom, and infrastructure projects since 2002.


HSD focuses on engineered steel structures for utility and infrastructure contractors. Buyers can review capability fast, then request drawings, audits, or quotations.
From forming and welding to galvanizing and export packing, HSD keeps every steel member controlled, traceable, and ready for site installation.

Steel plates and sections are formed to project drawings for tubular poles, gantries, and custom structures.

Critical joints and assemblies are fabricated under documented process control before final inspection.

Hot-dip galvanized coating helps your structures resist corrosion in coastal, industrial, and humid environments.

Members are bundled, marked, documented, and prepared for container or bulk vessel shipment.
Every project moves through documented checks from material certificates to final inspection reports.
Mill certificates and batch traceability before production.
Visual and NDT checks for critical joints.
Hole patterns and member sizes checked to drawings.
Zinc thickness measured to project standards.
Critical sections assembled before packing.
Inspection reports prepared for client review.
Fast trucking, practical loading plans, and export-ready documentation for overseas projects.
HSD supplies steel structures to utility, EPC, and infrastructure buyers across major overseas markets.
Philippines, Indonesia, Vietnam, Thailand, Myanmar, Malaysia, Cambodia
Saudi Arabia, UAE, Oman, Qatar, Kuwait, Iraq, Jordan, Yemen
Nigeria, Kenya, Tanzania, Ethiopia, Uganda, Ghana, Zambia, Mozambique
Brazil, Chile, Peru, Ecuador, Colombia, Argentina, Bolivia
Contact HSD for project drawings, inspection requirements, quotation, or a factory visit schedule.
Contact HSD Steel